Oh the paneling... |
The day we closed we ripped out all the paneling upstairs.
Underneath, we found sheetrock (thank you God!!) but in addition to nailing the paneling, they also glued it. So, when we took it off, there was pieces of sheetrock ripped off, black adhesive marks from the glue, and a lot of mudding and taping to do.
After ripping it all off |
While it was a pain, and long process to wait for it all to be done, still so glad we hired it out.
New chairs |
I love that the fireplace looks more grey then pink now |
Entry way is so much brighter |
2 colors meetin in corner |
Ta Da!! |
We went with two colors, both by Sherwin Williams. The main color is Collande Gray, which has some brownish tones to it, and the large wall behind the couch, and down the hallway was Big Chill, we wanted a shade of gray slightly lighter than the main walls since the hallway is so dark.
As you can see, we still need to replace the light fixutres and put up some curtains.
To do lists:
Entryway:
Rip down paneling (done)Fix sheetrock- Find new light fixture
- Replace door/window
- Replace wrought iron railings
- New tile instead of brick
Paint
Dining Room
- Knock out wall to the left, extending kitchen
- Putting sliding glass door in
- Remove carpet for kitchen flooring
- We will make the kitchen larger, more a combined kit/dr, similar to previous home, we dont care for a formal dining area. For now, will be used as a play area/toy room